Complete Installation Service

Planned Properly.
Installed Professionally.

From the first site survey and product specification through manufacture, installation, commissioning and long-term support.

LiveOperational sites
NewBuild projects
End-to-End Delivery

One Team From
Survey to Support.

EVICK installs the complete range of industrial and commercial access products we supply and support.

We work with customers, main contractors, architects, facilities teams and other trades to turn an operational requirement into a practical, maintainable installation. That begins with understanding the opening, environment, usage and interfaces—not simply selecting a product from a catalogue.

Our involvement can cover site surveys, planning, product specification, manufacture coordination, programme management, installation, controls integration, testing, handover and ongoing maintenance.

What We Install

Access Solutions for
Every Part of the Site.

Single openings, phased replacement programmes and multi-product new-build packages.

Industrial Doors

Roller shutters, sectional overhead doors, high-speed doors, fire shutters and specialist industrial entrances.

Loading Bay Systems

Dock levellers, shelters, associated doors, bumpers, restraints and supporting loading-bay equipment.

Automatic Doors

Sliding, swing and accessible automatic pedestrian entrances for commercial and public-facing buildings.

Steel & Personnel Doors

Secure personnel entrances, communal doors and steel door sets configured for the building requirement.

Gates & Barriers

Automated gates, vehicle barriers and traffic-control equipment for controlled site access.

Controls & Safety

Activation devices, access controls, safety systems and interfaces appropriate to the equipment and operation.

Our Installation Process

Defined Steps.
Clear Responsibility.

  1. 01

    Survey

    Assess openings, structure, services, access, operations, interfaces and site constraints.

  2. 02

    Plan & Specify

    Develop a suitable solution around performance, safety, compliance, budget and future maintenance.

  3. 03

    Manufacture

    Coordinate approved dimensions, finishes, controls and product requirements through manufacture and procurement.

  4. 04

    Coordinate

    Agree programme, access, RAMS, deliveries, lifting requirements and dependencies with the wider project team.

  5. 05

    Install

    Complete mechanical and electrical installation safely, professionally and with consideration for surrounding works.

  6. 06

    Commission

    Test operation and safety functions, complete agreed handover information and explain correct use.

  7. 07

    Support

    Provide planned maintenance, responsive repairs, parts, upgrades and lifecycle support after completion.

Installation work within an operational logistics site
Live Environments

Working Around
Business Operations.

Many installations take place where production, deliveries, employees and customers must continue moving. We coordinate work areas, isolations, vehicle routes, pedestrian segregation, deliveries and noisy or disruptive activities with the site team.

  • Phased and out-of-hours options
  • Clear work-area segregation
  • Operational and customer coordination
  • Security and temporary-access planning
Sectional door and loading bay installation on a new-build project
New-Build Projects

Coordinated With
the Wider Build.

On new developments, the best result depends on early coordination. We work around structural openings, steelwork, cladding, power supplies, floor levels, pits, controls and programme dependencies to help reduce late changes.

  • Drawing and opening review
  • Builder’s-work requirements
  • Manufacture and delivery scheduling
  • Coordination with principal contractors
Safe Delivery

Planned Around
People and Place.

Every installation is assessed in the context of the equipment, work area and people affected. Site-specific requirements may include RAMS, inductions, permits, lifting plans, isolations, access equipment and coordination with other trades.

Read our KISS safety principles
RAMS & planningCompetent engineersHazard controlStop-work authority
After Installation

Support That Continues
After Handover.

The equipment’s working life starts when the installation finishes.

EVICK remains available for planned servicing, safety checks, fault diagnosis, repair, parts and upgrades. Keeping installation and future support connected gives your team a clear route for maintaining safe, reliable operation.

Plan Your Installation

Ready to Discuss Your Project?

Tell us about the products, site, programme and operational requirements.

Request a Free Site Survey0115 990 2603